SAP C_TSCM42_67 Exam Dumps

SAP C_TSCM42_67 Exam Dumps

SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7

( 857 Reviews )
Total Questions : 106
Update Date : February 12, 2024
PDF + Test Engine
$65 $95
Test Engine
$55 $85
PDF Only
$45 $75

Discount Offer! Use Coupon Code to get 20% OFF DO2022

Recent C_TSCM42_67 Exam Result

Our C_TSCM42_67 dumps are key to get access. More than 4532+ satisfied customers.

38

Customers Passed C_TSCM42_67 Exam Today

99%

Maximum Passing Score in Real C_TSCM42_67 Exam

92%

Guaranteed Questions came from our C_TSCM42_67 dumps


What is Sap C_TSCM42_67 Exam ?

The SAP C_TSCM42_67 exam is the SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 certification exam. This exam validates that the candidate has a good understanding of the fundamental concepts of production planning and manufacturing in SAP ERP, and can implement this knowledge practically in projects under guidance of an experienced consultant.

The exam covers a wide range of topics in SAP Production Planning & Manufacturing, including:

Master data
Material requirements planning
Scheduling
Capacity planning
Execution and monitoring
Reporting and analytics

To be eligible to take the C_TSCM42_67 exam, candidates must have at least 6 months of experience in SAP Production Planning & Manufacturing, or have completed the equivalent SAP training.

The exam is 80 questions long and lasts for 180 minutes. The passing score is 63%.

Get ready to ace your Sap certification exam with our top-notch C_TSCM42_67 Dumps! Our C_TSCM42_67 exam dumps are designed to provide you with the most comprehensive and up-to-date Sap C_TSCM42_67 study Material and question answers. With our dumps, you'll be well-prepared to tackle the toughest C_TSCM42_67 exam questions, giving you the confidence to pass with flying colors! Don't waste your time with subpar C_TSCM42_67 study Mterials - choose our C_TSCM42_67  dumps and get the results you deserve. Get your hands on our C_TSCM42_67 study Mterial today and become an C_TSCM42_67 certified professional in no time! Order now and C_TSCM42_67  our exclusive Discount on Sap dumps.

C_TSCM42_67 Sample Question Answers

Question 1

Which of the following structural elements does a process order have? (Choose three.)

A. Item data
B. Parallel sequences
C. Relationships
D. Phases
E. Characteristic-based process instructions



Question 2

Which of the following statements best defines SAP ERP?

A. SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle.
B. SAP ERP is an application that a company can use to manage its business processes efficiently.
C. SAP ERP is a system in which advanced planning and optimization processes can be mapped.
D. SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.



Question 3

Which activity can trigger an automatic availability check for the components of a production order?

A. Material staging
B. Order rescheduling
C. Order release
D. Goods receipt for a missing part



Question 4

Which of the following statements about the planning functions available in SAP ECC is correct?

A. Master production scheduling (MPS) refers to preferred planning of important materials.
B. Material requirements planning (MRP) includes automatic capacity leveling.
C. Long-term planning (LTP) is a long-term form of forecast planning.
D. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.



Question 5

The final assembly of a finished product should only be triggered when a customer order arrives.Which planning strategy for the finished product do you use?

A. Planning with make-to-stock (strategy 10)
B. Planning at the assembly level (strategy 70)
C. Planning without final assembly (strategy 50)
D. Planning with final assembly (strategy 40)



Question 6

Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)

A. MPS items are planned in a standard MRP run.
B. The planning of MPS and non-MPS items is always carried out in one planning run.
C. Non-MPS items can be taken into consideration by an MPS run.
D. MPS items can be defined on plant level.
E. MPS items can be defined on MRP area level.



Question 7

What is SAP Solution Manager?

A. A transaction in the SAP ECC system
B. A standalone system that communicates with other systems in a system landscape
C. An add-on industry solution
D. A managed system in a system landscape



Question 8

For which of the following objects can you enter a confirmation? (Choose two)

A. Work Center
B. Production order operation
C. Production order
D. Trigger Point



Question 9

What do you have to consider regarding consumption? (Choose two)

A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption is restructured with the planning run.
C. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.



Question 10

What can you use to organize material staging for production orders? (Choose three)

A. Material documents
B. Transfer orders
C. KANBAN
D. Pull list
E. Logistics Information System (LIS)



Comments

Post Comment